What You Can Do
Use reusable templates to create separate dated runs with retained completion evidence.
Before You Begin
Use your business-approved procedures. Nommad records your entries; it does not define legal temperatures, certify safety or replace regulator guidance.
How To Do It
- Open Operations > Planning > Checklists and choose Add Template. Enter Name, choose Type (such as Opening, Closing or Food Safety), add Description, then choose Create Template.
- Open Add item on the template. Enter Item label, choose Type, specify Unit where relevant and mark Required only when the run must contain that observation. Choose Add item.
- Open Start run. Choose Source plan / service or No linked plan, check Date and Notes, then choose Start. This creates a separate saved snapshot of the template.
- Fill each run item using its displayed fields. Temperature/number items require a Measurement where marked required; enter Corrective action when relevant. Choose Complete for the item.
- After required items are complete, check the run status. Use Recorded completed to find finished runs and View Evidence to inspect saved observations and Recorded history.
- Use Manage template & items for future template changes. Where Reopen is offered for a completed run, supply the requested reason and preserve the existing evidence rather than starting a duplicate run.
What Happens Next
Completion records the observation, time and actor in the run history. Editing a template later does not rewrite a completed run snapshot.
Important To Know
Before choosing Start, Cancel discards only that composer's unsaved entries and closes it. It does not delete a saved run. If you try to leave with a draft, Continue editing keeps it; Discard this draft discards only the draft named in the warning. Save changes is a save action, not a way to dismiss the warning without saving.
A blank required measurement blocks completion. An entered number alone does not establish whether it meets your safety procedure.
A checklist run may be unlinked or tied to a specific plan/date. To open a plan-scoped view, open Production Planner, select the saved Plan / Date, expand Prep, plan summary & saved shopping, then choose Open plan-linked prep. Check Current plan context and choose Plan checklists. All checklists removes that service scope; use Active or Recorded completed and match the run date and source plan. Do not start a replacement just because another service view is empty.
Checklists do not automatically consume inventory or create maintenance/expense records.
Common Problems
- I cannot complete an item
- Fill every required field and review its type/unit.
- A save confirmation appeared but the run is missing
- Do not choose Start again. Open All checklists, check Active and Recorded completed, and match the saved run by its date and Source plan. Contact Support if it is still missing; do not create a replacement merely to clear the view.
- A finished run disappeared
- Choose Recorded completed rather than Active.
- A template edit did not change yesterday's run
- That preserves historical evidence; start a new run for a new service.