Vendor Operations

Run Checklists and record Food Safety observations

Use reusable templates to create separate dated runs with retained completion evidence.

What You Can Do

Use reusable templates to create separate dated runs with retained completion evidence.

Before You Begin

Use your business-approved procedures. Nommad records your entries; it does not define legal temperatures, certify safety or replace regulator guidance.

How To Do It

  1. Open Operations > Planning > Checklists and choose Add Template. Enter Name, choose Type (such as Opening, Closing or Food Safety), add Description, then choose Create Template.
  2. Open Add item on the template. Enter Item label, choose Type, specify Unit where relevant and mark Required only when the run must contain that observation. Choose Add item.
  3. Open Start run. Choose Source plan / service or No linked plan, check Date and Notes, then choose Start. This creates a separate saved snapshot of the template.
  4. Fill each run item using its displayed fields. Temperature/number items require a Measurement where marked required; enter Corrective action when relevant. Choose Complete for the item.
  5. After required items are complete, check the run status. Use Recorded completed to find finished runs and View Evidence to inspect saved observations and Recorded history.
  6. Use Manage template & items for future template changes. Where Reopen is offered for a completed run, supply the requested reason and preserve the existing evidence rather than starting a duplicate run.

What Happens Next

Completion records the observation, time and actor in the run history. Editing a template later does not rewrite a completed run snapshot.

Important To Know

Before choosing Start, Cancel discards only that composer's unsaved entries and closes it. It does not delete a saved run. If you try to leave with a draft, Continue editing keeps it; Discard this draft discards only the draft named in the warning. Save changes is a save action, not a way to dismiss the warning without saving.

A blank required measurement blocks completion. An entered number alone does not establish whether it meets your safety procedure.

A checklist run may be unlinked or tied to a specific plan/date. To open a plan-scoped view, open Production Planner, select the saved Plan / Date, expand Prep, plan summary & saved shopping, then choose Open plan-linked prep. Check Current plan context and choose Plan checklists. All checklists removes that service scope; use Active or Recorded completed and match the run date and source plan. Do not start a replacement just because another service view is empty.

Checklists do not automatically consume inventory or create maintenance/expense records.

Common Problems

I cannot complete an item
Fill every required field and review its type/unit.
A save confirmation appeared but the run is missing
Do not choose Start again. Open All checklists, check Active and Recorded completed, and match the saved run by its date and Source plan. Contact Support if it is still missing; do not create a replacement merely to clear the view.
A finished run disappeared
Choose Recorded completed rather than Active.
A template edit did not change yesterday's run
That preserves historical evidence; start a new run for a new service.

Still Need Help?

Include your business, the feature or page, what you tried, what happened and any visible error/reference code. Never send passwords, verification codes, recovery codes or private access links.

Contact Support Report an issue Vendor Terms