Vendor Operations

Preparing for a service day with Nommad

A worked example that follows menu, recipe, planning, shopping, receiving, prep and closeout together.

What You Can Do

A worked example that follows menu, recipe, planning, shopping, receiving, prep and closeout together.

Before You Begin

This is fictional practice data from Nommad Demo Grill, not real menu advice, pricing or a live business. Use your own accurate counts and costs.

You need authorized access to Menu and Operations. Batch-production/stock-lot tools are not used in this example.

For a complete fictional closeout rehearsal, use a clearly labeled service dated today or earlier. Finalization is not offered for a future service: retain its Draft until that service occurs rather than changing its date to bypass the restriction.

Farm-stand practice variant: follow the same thirteen steps with a Produce boxes category and Seasonal Produce Box at $18 instead of the $12 sandwich. Replace Demo buns with Demo empty produce cartons, choose Packaging rather than Ingredients, and keep 5 each on hand, $1 per carton and the low-stock threshold of 10. Use supplier Demo Harvest Supply. This intentionally simple recipe tracks packaging only; it does not include the produce cost.

For that variant, name the recipe Demo produce box packing, keep Yield 1 serving, link the produce-box menu item, and add 1 each Demo empty produce cartons. Enter the prep instruction Prepare the planned cartons for produce boxes; the fictional contents are two apples, two carrots and two tomatoes per box. Those contents are practice information, not additional saved recipe ingredients or automatic stock deductions. Copy the selected $18 menu price instead of $12. The $1 packaging-only recipe cost would leave $17 before all omitted costs, not $11; neither that comparison nor its percentage is a complete profit margin.

Keep every remaining example quantity unchanged: plan Harvest practice service for 10 customers with a 10% buffer and a forecast of 10 boxes. Buy 6 cartons for $6, receive 3 then 3, record a separate $10 Harvest practice service fuel expense, and save 11 prepared, 9 sold, 1 waste and 1 remaining. Use your one selected service date for the plan, checklist, expenses and summary. This small rehearsal uses 10 customers to match the arithmetic below; it is not a forecast for a real farm stand.

How To Do It

  1. In Menu > Menu items, create a Sandwiches category, then add Demo grilled sandwich at $12 into that category. Include in structured public menu applies only to existing structured public placements; it does not replace uploaded artwork or the separate Menu Display publication review.
  2. In Operations > Inventory, choose Add Item. Enter Demo buns, Category Ingredients, On Hand 5 and Unit each. Choose Price per stock unit and enter $1; set Low-stock alert at 10. Choose Create supplier and enter New supplier name Demo Supply, then Add Item. Check Low Stock and $5 value.
  3. In Recipes & Costs, create Demo sandwich assembly with Yield 1 serving, linked to the sandwich. Use selected menu price to copy $12 as the comparison. Enter Prep instructions such as Assemble the planned Demo grilled sandwiches. Choose Create Recipe, then Add Ingredient: Demo buns, Amount 1, Unit each. The simplified ingredient cost is $1/serving; the $11/92% figures are estimates before other costs.
  4. In Planning > Production Planner, create Demo service day for your date, 10 Expected guests and a 10% buffer. In Servings by item, add 10 forecasted sandwiches and select the linked recipe.
  5. Review the result: base forecast 10, buffered 11, buns required 11, on hand 5, shortage 6 and known shortage estimate $6. This has not changed stock or recorded spending.
  6. Choose Review shopping changes, inspect Added: Demo buns, 6 each, Demo Supply, then Apply reviewed changes. Choose Review prep in the plan decision summary, or Review prep changes in the expanded prep section. Inspect the explicit recipe prep instruction for 11 servings and apply it separately.
  7. In Purchasing > Shopping List, open Confirm purchase for the buns. Record 6 each bought and $6 paid. Select Create linked expense, then Mark purchased. This records one $6 expense but leaves Inventory at 5. No payment or external order is sent.
  8. When half the goods arrive, open Receiving and enter 3 each. Review receipt must say stock 5 to 8, three outstanding. Confirm receipt. When the remaining three arrive, review and confirm stock 8 to 11, zero outstanding. Receiving creates no additional expense.
  9. Revisit the Planner. The requirement is now Covered. Open the plan-linked Prep List and complete the saved preparation task when the physical work is done. Prep completion does not deduct those buns.
  10. Open Planning > Checklists and choose Add Template. For fictional practice, name it Demo opening observations and choose Opening, then Create Template. Open Add item, enter an observation label, choose its Type and Unit, mark Required if appropriate, and Add item. Use your real business-approved procedure for real work. Open Start run, select the Source plan / service and Date, then Start. Fill the required observations and choose Complete. Use Recorded completed and View Evidence to check the saved run. This does not certify food safety.
  11. In Expenses, choose Add Expense. Enter Item / Description Demo service fuel, Category Fuel, Total Amount $10, the actual Date and known payment details, then Add Expense. Total recorded expenses are now $16: the existing $6 purchase expense plus $10 fuel. Do not add the $6 again.
  12. In Planning > Daily Summary, choose New Summary and select the Source plan / service. Check Date, Shift name and Expected customers 10. Planned quantity is the base 10, not buffered 11. Choose Create Summary, enter 11 Prepared, 9 Sold, 1 Waste and 1 Remaining, then Save actuals.
  13. Open Review & finalize shift. Check 11 = 9 + 1 + 1, select I have reviewed these saved quantities., then Finalize shift. Confirm the saved fields are locked. No inventory usage, waste movement, payment or new expense is posted by this finalization.

What Happens Next

Keep your physical counts and any deliberate stock usage/corrections accurate separately. Use the saved source links to investigate differences instead of assuming all records synchronize automatically.

Important To Know

For drinks, set item-specific pack contents before receiving: half of a 50-cup sleeve means 25 cups. For bakery planning, a recipe yield describes its batch size; plan serving amounts consistently. These adaptations require your real units and counts, not invented conversions.

Purchasing, Receiving, Prep, Checklists and Daily Summary are separate deliberate saves. Changing the plan later requires a fresh review; it does not rewrite performed work.

Common Problems

My example differs
Check the selected business, recipe yield, forecast mode, buffer, saved quantities, prior receipts and plan context. Do not change real records to imitate this fictional example.

Still Need Help?

Include your business, the feature or page, what you tried, what happened and any visible error/reference code. Never send passwords, verification codes, recovery codes or private access links.

Contact Support Report an issue Vendor Terms